redesign Factory layout
consultation

Suffering from loss of sales due to clogged & congested material flow?

Painful Experience

That Can Actually be Solved

Clogged material

Delay in production & delivery

Limited Expansion & Productivity

Having Sales Order but can't produce

Benefits

Why Re-Layout Your Production Flow?

Optimising material flow

Minimal material handling to increase your productivity by 20%

Effective utilisation of labour, space and equipment

Reduce unnecessary wastage

Increase profitability

Building your sustainable business

Blind Spot
7 Critical Factors in Designing An Optimal Production Layout

Sounds Simple But Many Neglected It 

Minimise the transportation time of material and labour 

No space left wasted, both horizontally and vertically 

The best direction is: 1 way in, 1 way out 

Space for future expansion and etc must be taken into consideration 

Relevant process / operation should be located closely to each other

As an entrepreneur, it’s our responsibility to ensure the workers’ safety and satisfaction (apart from profit)

Ideally, everything should be placed under 1 roof 

Characteristic
Different Type of Production Layout

Choose What’s Best For You 

Suitable for those “low mix, high volume” type of production 

Suitable for production which requires same operation  / process 

Combination of the above 2 

Suitable for bulky, heavy-type of production 

Services
How To Kickstart With Us?

You will get a COMPLETE AutoCAD DRAWING 

Let us know your current product and production flow

Analyse data and develop the layout based on the available space

We’ll give you a COMPLETE AutoCAD DRAWING so that you can renovate based on the drawing.

We have more than 30 years of experience in manufacturing line

“I’m Loh Poh Ming, AGM of Asia Poly. What I like about Yen Premium Coach is the consultancy in guiding us in moving towards IR 4.0 is excellent. Their advice and proposal is very detail orientated.
I’d strongly recommend Yen Premium Coach to those who are looking for a professional IR4.0 consultant to guide through the process towards IR4.0.”

Ms Loh Poh Ming

Assistant General Manager, Asia Poly industrial Sdn Bhd

Choose Your Package

Package A
RM15,000 + 8% SST

  • ≤ 2 Production Lines
  • Min 2 or Max 3 Optional Layout Will Be Given
  • A Complete Technical Drawing Will Be Given
  • 3-Month Consultation

Package B
RM25,000 + 8% SST

  • ≤ 4 Production Lines
  • Min 2 or Max 3 Optional Layout Will Be Given
  • A Complete Technical Drawing Will Be Given
  • 3-Month Consultation

Package C
RM35,000 + 8% SST

  • ≤ 6 Production Lines
  • Min 2 or Max 3 Optional Layout Will Be Given
  • A Complete Technical Drawing Will Be Given
  • 3-Month Consultation

A Profitable Factory Starts From The Right Plant Layout

Reducing Global Warming By 1.5°C Through ISO & IR4.0